How did you do step 3 above? Did you use the supplied scripts or did you manually adjust each resource by logging into them and setting scheduled time to show up as free.
You would have to do that process in reverse by running the 2nd script to return the resources to showing time as busy or logging into the resource manually and doing the same.
I'm curious though if you ran the scripts as I'm having trouble running them due to permissions I believe.